Loading
Location
Jakarta, Indonesia
Type
Residential
Scopes
Bored Piles & Diaphragm Wall
Scales
Total length: 142.3 km with a top speed of 350 km/h
Total D-Wall: 19.8 ~ 26.9m with thick from 0.8 ~ 1.2m
Commence Date
Finish Date
Employer
The train runs about 140 kilometers between Jakarta and Bandung, the West Java provincial capital and a popular tourist destination. The entire route has four stations, with the maximum operating speed reaching 350 kilometers per hour. Using a feeder train connecting to the high-speed train, travelers can now go to the central area of Bandung from Jakarta in less than 1 hour.
Tung Feng was being in charge of 5.9 km tunnel in Jakarta route, with total 400 piles.
Taipei Headquarter
5th Floor, No. 79-1, Zhouzi St.,
Neihu District, Taipei City 114 Taiwan R.O.C
886-2-27976399
886-2-27976399
one.tf@msa.hinet.net
Ho Chi Minh
R803 & R905, Mapletree Business Center Building,
1060 Nguyen Van Linh St.,
Tan Phong Ward, District 7,
HCM City, Vietnam
84-28-3620 3527
84-28-3620 3528
Malaysia
A-30-09, Level 30, Tower A, Menara UOA, Bangsar No. 5 Jalan Bangsar Utama 1
59000 Kuala Lumpur
W.P.Kuala Lumpur, Malaysia
603-2282 1057; 2282 607
603-2201 1185
Hanoi
No. A401-402, 4F, A Block, Keangnam Hanoi Landmark Tower,
E6, Cau Giay New Urban Area,
Me Tri Ward, Tu Liem District,
Hanoi City, Vietnam
84-24-3776 4691/97
84-24-3776 4698
Cambodia
No.153E0, Street No.160, Sangkat Teuk Laaok 2,
Khan Toul Kork, Phnom Penh City,
Cambodia
Indonesia
JL. Kebon Sirih No. 88 Jakarta Pusat
021-3806966
021-3806966
Philippines
27F, Tower 2, The Enterprise Centre,
6766 Ayala Ave., corner Paseo De Roxas,
Makati City, 1226 Philippines
+63 2 8886-5006
+63 2 8886-5006